A draw is a scheduled release of part of the renovation budget. At closing, the purchase is funded, but the rehab money is set aside in a holdback. As you complete portions of the work, you request a draw for the completed stage, the work is verified, and the funds for that stage are released to you (or in some structures, paid toward the work). You then move to the next stage, and repeat, until the renovation is finished and the last draw is released.
In other words, the rehab budget is spent in arrears against progress, not advanced against a promise. The total you are approved for does not change — you simply receive it in pieces that track the actual construction, rather than all at once on day one.
Why funds release against completed work
Releasing renovation money in draws is not bureaucratic caution — it is what protects a project where the value being created lives in the work itself. Consider the alternative. If the entire rehab budget were handed over at closing, the money would be exposed to every ordinary risk of a construction project: a contractor who takes the deposit and disappears, funds spent on the wrong priorities, a project that runs out of money mid-renovation with an unfinished house and no budget left to complete it. On a high-leverage deal, that exposure is unacceptable to whoever funded the stack.
Draws align the money with the work in a way that serves everyone:
- The funds are protected. Money is only released for work that actually exists, so the capital is always backed by real, verifiable progress on the property.
- The project stays on budget. Because each stage is checked before the next is funded, an overrun or a stalled phase surfaces early — while there is still budget left to correct it — rather than at the end when the money is gone.
- The operator is protected too. A draw structure imposes the discipline of completing and verifying each phase, which is exactly the discipline that keeps a renovation from drifting off schedule and over budget.
This is the reason the 100% Purchase & Rehab structure funds rehab in draws against verified completed work. When a capital partner is funding up to 100% of the stack — on qualifying joint-venture transactions where total project cost stays within 70% of the after-repair value — with no borrower cash underneath it, the draw process is the mechanism that keeps the whole structure safe.
The schedule of values
The draw process runs on a document called the schedule of values — sometimes just the draw schedule. It breaks your total rehab budget into phases or line items, each with a dollar amount, so everyone agrees in advance what work corresponds to what money. It is built from your line-item budget, which is one reason a lump-sum "renovation: $50,000" will not underwrite: without the breakdown, there is nothing to release draws against.
A schedule of values is typically organized by trade or by construction phase — demolition, rough mechanicals, framing and structure, drywall, flooring, kitchen and baths, finish work, and so on. Each phase carries an allocated amount, and a draw is released as each phase reaches completion. Build the schedule realistically from the start; the rehab budget worksheet helps you assemble the line items in the order the work — and the draws — actually happen.
The draw process, step by step
The specifics vary by program and capital source, but the cycle is consistent:
Complete a phase
You finish a stage of work defined in the schedule of values — say demolition and rough plumbing.
Request the draw
You submit a draw request for the completed phase, usually with documentation such as photos, invoices, or lien waivers as required.
Verification
The completed work is confirmed, most often through an inspection, to establish that the phase is genuinely done.
Funds release
Once verified, the allocated funds for that phase are released, and you move on to the next stage of the renovation.
Repeat to completion
The cycle repeats phase by phase until the renovation is finished and the final draw is released.
Because the site.js?v=brokerage-video-20260801 on this page auto-detects the steps above, the takeaway is simple: work, request, verify, release, repeat. The number of draws, the documentation required at each, and the turnaround time are set by the specific program and confirmed per transaction — {{CLAIM:rehab.draw_turnaround}} — confirming against current program sheet.
The inspection, and what it checks
The inspection is the verification step that makes the whole structure work. An inspector — independent of you — visits the property and confirms that the work claimed in the draw request has actually been completed to the expected standard. It is not an adversarial process; it is the confirmation that lets funds release with confidence.
A draw inspection generally checks that:
- The claimed work exists. The phase you requested a draw for is physically present and complete on site.
- It matches the scope. The work aligns with the schedule of values and the approved budget, not a different or lesser version of it.
- Quality is appropriate. The work is done to a standard consistent with the finished value the project is underwritten to.
- The project is on track. Progress is broadly consistent with the timeline and the budget remaining.
Where required, permits and appropriate sign-offs for permitted work factor in as well. The cleaner and more complete each phase is when the inspector arrives, the faster the draw clears — which is entirely within your control.
Managing cash flow between draws
Here is the operational reality every renovator must plan for: because draws release after work is completed, you frequently have to fund or order the work for a phase before you are reimbursed for it. Materials get purchased, subs get scheduled, and the draw for that phase does not arrive until the work is verified. That gap is normal, and it is why reserves matter even on a project where capital covers the full budget.
Practical ways to manage the gap:
- Keep working capital available. Enough to carry at least a phase of work while a draw is verified and released. This is one of the main reasons reserves are strongly preferred even under full-stack funding.
- Understand your contractor's terms. Some contractors carry material and labor costs between draws; others need progress payments. Know which before you start, and align the draw schedule with how your contractor actually gets paid.
- Sequence draws sensibly. Structuring the schedule so phases and draws fall at intervals you can bridge keeps the project from stalling on a cash gap.
A renovation with no reserve behind it is fragile: one delayed draw or one surprise repair can stall the whole job. Planning for the timing gap up front is not pessimism — it is what keeps the project moving.
How to keep draws moving
Draw delays are usually self-inflicted and entirely preventable. To keep money flowing:
- Only request a draw when the phase is genuinely done. A half-finished phase fails inspection, and a failed inspection costs you a full cycle.
- Document as you go. Photos, invoices, and any required lien waivers assembled in real time make each request clean and fast.
- Communicate schedule changes early. If the sequence shifts, say so before the inspection, not after.
- Match the request to the schedule of values. Draw against the phases as they were defined; ad-hoc requests that do not map to the schedule create friction.
Run the draw process well and it becomes invisible — money arrives as work completes and the project stays on rhythm. Run it poorly and it becomes the thing that stalls the deal. The discipline it requires is the same discipline that finishes renovations on time and on budget.
Frequently asked questions
Do I get any rehab money at closing?
Generally the purchase is funded at closing while the rehab budget is held back and released in draws as work is completed. Whether any portion of rehab is available at or near closing depends on the specific program and structure, and is confirmed per transaction. Plan on funding the first phase of work before the first draw releases.
How many draws will a project have?
It depends on the size and scope of the renovation and the program's structure. A light cosmetic project may have a small number of draws; a heavy or ground-up project will have more, tied to more construction phases. The number and the phase breakpoints are set in the schedule of values agreed up front.
How long does a draw take to fund after I request it?
Turnaround depends on how quickly the inspection is scheduled and completed and on the program's processing. A clean request for genuinely completed work, with documentation ready, moves fastest. The applicable timing is confirmed per transaction rather than quoted as a fixed number here.
What happens if a draw inspection fails?
If the inspection finds the phase incomplete or not matching the scope, the draw is typically held until the work is finished or corrected and re-verified. That costs you a cycle of time, which is exactly why you should only request a draw when the phase is truly done and documented.
Can the draw schedule be changed mid-project?
Meaningful changes to scope or sequence usually need to be communicated and, where required, approved, because the schedule of values is what draws release against. Surprises found during renovation are common; the key is raising them early so the budget and schedule can be adjusted before they stall a draw.
Draws are the funding mechanism behind the 100% Purchase & Rehab program and every ground-up construction project. Before you set a budget, read how ARV is derived so the finished value supports the work, and weigh your funding structure in debt versus joint-venture capital.